danwilderspin
Member
Hi guys - I’m on a drive to Lee my line lengths short as I’m wasting beer in them.
I currently have kegs with 4ft of 3/8 coming out going through a chiller which then goes into a 9ft 3/16 line to the tap… works perfectly…
The new plan was to have the 3/16line 3FT and and the 3/8 2ft
Unfortunately everything is a fobbing mess … is there anyway around it ?
I currently have kegs with 4ft of 3/8 coming out going through a chiller which then goes into a 9ft 3/16 line to the tap… works perfectly…
The new plan was to have the 3/16line 3FT and and the 3/8 2ft
Unfortunately everything is a fobbing mess … is there anyway around it ?